Pressure Equipment Directive (PED 2014/68/EU): Category Tables I to IV, Fluid Groups and Modules
How is pressure equipment classified into Categories I to IV under PED 2014/68/EU? Pressure Equipment Directive (PED 2014/68/EU) classifies pressure vessels, steam generators, piping, and safety accessories into Sound Engineering Practice (SEP) and Hazard Categories I, II, III, or IV based on five parameters: equipment type (vessel, steam generator, or piping), physical state of fluid (gas or liquid), fluid hazard group (Group 1 dangerous vs Group 2 non-dangerous), maximum allowable pressure (PS in bar), and internal volume (V in litres) or nominal size (DN in mm). Categories I through IV require progressive conformity assessment modules from self-certification (Module A for Category I) up to full quality assurance with design examination by a Notified Body (Module H1 or G for Category IV).
Engineering guide to PED 2014/68/EU classification: Category Tables 1 to 9, PS·V thresholds, Fluid Group 1 vs 2, and Module A to H1 conformity routes.
Technical Specifications & Regulatory Comparison Matrix
| PED Category | Equipment Examples | Conformity Modules Allowed | Notified Body Involvement |
|---|---|---|---|
| SEP (Sound Engineering Practice) | Small compressed air tanks (PS·V < 50 bar·L), water pipes | Sound Engineering Practice (Article 4(3)) | NO (No CE mark permitted) |
| Category I | Standard industrial air tanks (PS·V = 50 to 200 bar·L) | Module A (Internal production control) | NO (Manufacturer self-declaration) |
| Category II | Medium air receivers, industrial chillers, refrigerant piping | Module A2, D1, E1 | YES (Unannounced inspections or QM audit) |
| Category III | Steam boilers, large pressure reactors, toxic chemical piping | Module B (design type) + D or F, Module H | YES (Full type examination & production surveillance) |
| Category IV | High-pressure fire-tube boilers, dangerous gas vessels (PS > 500 bar) | Module B (production type) + D or F, Module G, Module H1 | YES (Design examination + individual testing) |
1. Fluid Group Classification (Article 13)
Fluid Group 1 comprises dangerous substances defined under CLP Regulation (EC) 1272/2008 (explosives, extremely/highly flammable gases, flammable liquids, acute toxic categories 1 to 3, and oxidizing agents). Fluid Group 2 comprises all other fluids, including steam, compressed air, nitrogen, and non-toxic water. Classifying a fluid into Group 1 substantially shifts equipment into higher regulatory categories.
2. Choosing Between Table 1 to 9 of Annex II
Annex II contains 9 distinct classification charts: Tables 1 to 4 apply to pressure vessels (gases vs liquids, Group 1 vs 2); Table 5 applies to steam generators and boilers; Tables 6 to 9 apply to industrial piping systems. For assemblies (e.g., an industrial refrigeration skid combining compressor, condenser, and valves), the assembly must be assessed based on the highest category of any component not exceeding safety accessory ratings.
Automate Regulatory Compliance with IgeraIndustria
Our specialized Industrial AI analyzes technical construction files, harmonized standards, and supplier declarations in seconds — fully verified and hallucination-free.
Request Engineering DemoFrequently Asked Questions (FAQ)
Can pressure equipment below Category I (SEP) bear a CE mark?
No. Article 4(3) explicitly prohibits affixing the CE mark to equipment classified as Sound Engineering Practice (SEP), although it must still be safe and accompanied by adequate instructions.
What are safety accessories under PED?
Safety accessories are devices designed to protect pressure equipment against exceeding allowable limits (e.g., safety relief valves, rupture discs, bursting pins, and safety pressure limiters - SIL classified). They are automatically placed in Category IV, or matched to the equipment they protect.
📥 Lead Magnet: PED Category Calculation & Conformity Module Decision Chart
Instant calculation formulas and visual charts for Tables 1 through 9 to classify pressure vessels, piping, and boiler skids accurately.
Download Compliance Template →Editorial note: Last updated September 2026. Reviewed by the Igera Industrial Compliance Committee.