Industria

Machinery Regulation Conformity Assessment Routes: Module A, Module B+C, and Module H Compared

Dr. Arthur Campbell (Industrial Compliance)
18 de septiembre de 2026
10 min min read
Machinery Regulation Conformity Assessment Routes: Module A, Module B+C, and Module H Compared
🎧 Escuchar con Voz IA

Resumen ejecutivo de 2 minutos

⚡ Respuesta Rápida en 30s (Claves del Tema)

Detailed comparison of Module A (Internal Production Control), Module B+C (EU Type-Examination), and Module H (Full Quality Assurance) under Regulation (EU) 2023/1230.

✓ Cita de normativa vigente (LPH / Código Civil)Ver guía detallada a continuación ↓
CERTIFICATION ROUTES · CONFORMITY MODULES

Machinery Regulation Conformity Assessment Routes: Module A, Module B+C, and Module H Compared

DIRECT REGULATORY ANSWER (60 SECONDS):

What conformity assessment modules are available under Machinery Regulation (EU) 2023/1230? Regulation (EU) 2023/1230 establishes three primary conformity assessment procedures detailed in Article 25: Module A (Internal Production Control, Annex VIII), Module B followed by Module C (EU Type-Examination followed by Conformity to Type based on Internal Production Control, Annex IX & X), and Module H (Full Quality Assurance, Annex X). Module A is the standard route for over 90% of industrial machinery not listed in Annex I; Annex I Part A machines strictly require Module B+C or Module H, while Annex I Part B machines require Notified Body intervention only if harmonized standards are not applied in full.

Detailed comparison of Module A (Internal Production Control), Module B+C (EU Type-Examination), and Module H (Full Quality Assurance) under Regulation (EU) 2023/1230.

Technical Specifications & Regulatory Comparison Matrix

ModuleOfficial NameNotified Body Required?Best Suited ForCost & Timeline Impact
Module A Internal Production Control No (Manufacturer self-declaration) Standard machinery, serial packaging lines, conveyors
Module B + C EU Type-Examination + Conformity to Type Yes (Module B testing of prototype by Notified Body) Annex I machinery, innovative prototypes, unique custom units
Module H Full Quality Assurance Yes (ISO 9001-style audit of design & manufacturing) High-volume Annex I manufacturers with mature QM systems
Module G Unit Verification Yes (Notified Body tests individual custom machine) One-off massive industrial plants, heavy tunnel boring machines

1. Module A: Internal Production Control (Annex VIII)

Under Module A, the manufacturer compiles the technical file, implements quality measures to ensure serial production conforms to the design, affixes the CE mark, and signs the EU Declaration of Conformity. No Notified Body is involved. However, the manufacturer assumes full civil and criminal liability for compliance with all applicable EHSRs.

2. Module H vs Module B+C for High-Risk Machine Builders

For companies manufacturing Annex I equipment on a serial basis, Module H provides significant operational advantages over Module B+C. Under Module H, once the Notified Body audits and approves the comprehensive quality assurance system (covering design, manufacture, final inspection, and testing), the manufacturer can introduce new model variants without submitting each prototype for an individual EU Type-Examination certificate.

Automate Regulatory Compliance with IgeraIndustria

Our specialized Industrial AI analyzes technical construction files, harmonized standards, and supplier declarations in seconds — fully verified and hallucination-free.

Request Engineering Demo

Frequently Asked Questions (FAQ)

How long does a Module B EU Type-Examination certificate remain valid?

Under Article 25 and Annex IX, certificates are issued for a maximum of 5 years and must be reviewed prior to expiration to verify whether state-of-the-art standards have changed.

Can an ISO 9001 certified company automatically use Module H?

No. General ISO 9001 certification is insufficient. The quality system must specifically cover the regulatory design and manufacturing controls of Regulation (EU) 2023/1230 and be formally audited by an accredited Notified Body.

📥 Lead Magnet: Machinery Conformity Assessment Module Selector Guide

Determine the most cost-effective and legally compliant certification route for your machinery portfolio before 2027.

Download Compliance Template →

Editorial note: Last updated September 2026. Reviewed by the Igera Industrial Compliance Committee.

Pregunta a este artículo

IA 2026

El asistente de Igera responde dudas citando los datos y la normativa de este artículo

2 de 2 consultas libres

Preguntas frecuentes sugeridas (haz clic para probar):

Diagnóstico Interactivo 60s

Diagnóstico de Compliance Técnico y Operaciones Industriales

Analiza la velocidad de acceso a normativas (CTE, PRL, CE) en tu planta u obra

Pregunta 1 de 3

¿Cómo acceden los técnicos y operarios a los protocolos y manuales?

¿Te ha resultado útil este artículo?

⚙️IgeraIndustriaPlantilla de Operaciones
GUÍA DESCARGABLE (TXT)

Checklist de Mantenimiento Preventivo y Protocolos ISO 9001 / 45001

Plantilla operativa para técnicos de planta: rondas de revisión de maquinaria, registro de anomalías y control de paradas no programadas.

  • Estandarización de protocolos de turno para operarios
  • Reducción de hasta un 40% en tiempos de respuesta ante averías
  • Trazabilidad para auditorías de calidad ISO y prevención de riesgos

Descarga inmediata · Sin tarjeta · 100% libre de spam

Comparte este artículo

Ayuda a difundir conocimiento compartiendo este contenido con tu red